Uneven foundation concrete wall and sill plates/framing issue. I am building a home with a typical level 1-2 builder in Texas. Concrete was poured couple weeks ago, and framing has almost finished. Very quickly, it has concerned me that, what it appears to be a load bearing wall, the framing is not sitting flush with the concrete because of the. sill plate not flush with foundation. February 4, 2021 Leave a comment. First, we aligned 2x12 plates on the 33-foot foundation wall with their inside edges flush with the inside of the wall. Then we marked them — as shown in the illustration on the previous page — so that there would be an inch of sill plate extending over the foundation at one end of the wall (3/4 inch less than the desired 1 3/4 inches), and. i.e. do you set the mudsill flush with the outside of the foundation wall, or set it in +/- 1/2″? i just had this argument (again) with a co-worker it seems to me that assuming the foundation is gonna come out square enough that i can trust it to align the mudsill with it (assuming i care about the walls being square) is a bit optimistic

Please tell me those sill plates are bolted to the foundation and NOT shot in!!!! - Gunner Jun 12 '13 at 1:42. 2. I'm still trying to figure out why that bottom plate on the right doesn't have any studs and why there isn't any structure in the corner. Typically walls are built on the ground and raised up with the studs already nailed in at. When it comes to a slab foundation, what are the pros and cons of setting the sill plate back the thickness of the sheathing in order to allow the face of the sheathing to be flush with the foundation face? Then when you attach the siding you can set it a bit below the sheathing to overlap the foundation face and the siding creates a drip edge Flashing the siding and wall sill plate at the top of a foundation wall that does not project out past the upper wall is pretty easy. Steve Bliss' sketches below illustrate flashing at a concrete foundation wall (below left) or at a house wall where a water table trim board is installed (below right) Construction is 2x6 wall, 7/16 OSB, 2 inch EPS foam (high perm), house wrap, 3/4 rain screen and siding. Currently exterior walls are up, with a standard foam sill plate gasket and the 7/16 OSB. I am wondering if the OSB in direct contact with the concrete foundation wall will be an issue when the whole wall is completed. Drainage plane for the house wrap is right at the edge of the. I'm in the process of building a new home where we're using ProtectoWrap Triple Guard Energy Sill Sealer and Zip R-Sheathing. The idea was that the sheathing would be in the same plane as the foundation wall, run down to the top of it and be flashed with the Sill Sealer. Unfortunately the framing crew set the sill plate flush with the foundation wall and, because we have a brick veneer planned.

Uneven foundation concrete wall and sill plates/framing issu

sill plate not flush with foundation - fixthatmac

The Sill Plate's Role in Framing. The sill plate is made with wood lumber—usually 2 x 6 or larger—laid face-down on top of the masonry foundation wall. Together, the sill plates run along the entire foundation. The first-floor frame is built on top of, and anchored into, the sill plates. The floor frame consists of common joists, which. A sill plate (also called a sole plate, or simply a sill) is the bottom piece of wall structure where wall studs are attached. They are typically anchored to the foundation and serve as a very important component of all houses. If the sills become damaged or rotten, you can end up with problems like sagging floors

How to Anchor a Sill Plate to a Cinder Block Foundation. A sill plate sits on top of the foundation and serves as the structural base for the floor joist frame. Sill plates are made from treated. Take a look: You can see the white foundation, and the sill plate resting on top of the foundation. Above the window, however, there is no header to support the sill plate. Thus, two of the floor joists are resting on the unsupported portion of the sill plate. As you can guess, the sill plate has sagged under the weight, and now the window is. If the wall plates are not flush with the foundation—meaning that the foundation is not square and the walls are—use low-expanding canned foam to seal the big gaps. The bottom line: The multiple layers of sealing will substantially reduce air leaks along this important part of a house

Framing Fix for a Faulty Foundation JLC Onlin

Sheathing overlaps or flush w/ found'n?? - Fine Homebuildin

The New House Next Door: November 2013Common Questions for Log Style Homes`Pennsylvania Maryland

framing - Is it OK that the frame of my house doesn't line

Should the mudsill be set back the distance of the

  1. My joists sit on top of the sill plates, thus I can't add blocking that is flush with the bottom of the joists. If I want the blocking flush with the bottom of the joists, then the blocking will be sitting on top of the sill plate, and I would have no way to nail the blocking to the sill plate because of very tight conditions
  2. Base flashing. The wall system begins with flashing at the bottom of the wall, which collects water that drains down the wall and kicks it out at the base. Metal or PVC flashing can be used. It should have a drip edge that hangs below the sill plate, with the bottom edge at least 8 inches above grade . Weather-resistive barrier
  3. Not wanting to use a wood floor again, and not wanting to pump concrete thru window wells, I decided to cover dirt floor with concrete pavers flush with the top of the foundation. I first used road base, then 6 mil vapor barrier, then more road base, then 2″ foil faced foam (R-Max), another 6 mil layer, paver sand
  4. While he was sealing cold sems in the basement he asked me about the 2x4 bottom plates embedded in the concrete (flush, 1-1/2 into). After inspection, the bottom plates in question were for the interior walls only, but where the abutted the ext. wall bottom plate they continued under and up to the poured wall
  5. If constructing on a foundation, the first step is to construct a floor on the foundation. Sill plates are anchored to the foundation, then the floor joists are fastened to the sill plates and their ends boxed in with joist headers. The headers and outside joists should fit flush with the outside edges of the foundation

Siding or Wall-to-Slab or Foundation Top Flashing Wall

sill plate overhangs the foundation and the vent does not fit flush against foundation. a flush and airtight fit is a must! if the sillplate over hangs or is recessed from the foundation/crawl space, use a ix2, or 2x4 and cut it to the length of the opening in the foundation. attach the cut lumber to the sill plate 1-13, the top of the girder is flush with the top sill plate. When space is required for heat ducts in a partition supported on a girder, a spaced wood girder, such as that rests directly on the sill plate of the exterior foundation wall or on the top plate of a framed outside wall. The bearing should be at least 1 1/2 inches Trick for Attaching Sill Plates to Concrete Footings: Attaching sill plates to continuous footings on the first try can be a challenge. Traditionally, contractors will lay the sill plate on top of the anchors and bash it with a hammer to mark the location of the anchor bolts. Typically the board will

OSB sheathing touching foundation wall: Should I be

  1. As such it should not be exposed to flames or other sources of ignition. n Finish foundation according to applicable building codes and remove all high points greater than 3/16. n Clean debris from surface and unroll ICA Sill Seal on top of foundation wall flush with the wall face or staple to bottom of sill plate
  2. After the sill plate is placed on top of the foundation, it is secured most often with J-bolts or sill straps. This anchoring system creates a bond of substantial strength between the foundation.
  3. 1. Check the sill plate to be sure it has been adequately bolted to the foundation. 2. Check to be sure the sill plate and studs are the same dimensions (flush at face). If not, block between the studs and nail the blocks into the sill plate with six 16d nails per block to create a flush nailing surface for the plywood. 3
  4. Unroll the R-TiteTM sill plate gasket on top of foundation wall flush to foundation face, or staple to sill plate or bottom of tilt-up wall sections. Fit all joints tightly, and for larger gaps layer the thickness for an air-tight seal. For anchor bolts just cut or impale R-TiteTM for a secure fit. Position sill plate, proceed wit
  5. The cellar or basement or crawlspace side of the stone/concrete foundation should be sealed at the sill plate, sill log and between every Joist box where the joists meet the sill ! For years the current code was just to fill the pocket or box where the joist meets the sill with fiberglass insulation
  6. use a 1>0, 2x2, or 2x4 and cut it to the length of openng in foundation. attach the cut lumber to the sill plate flush with the foundation using all purpose screws or nails to attach (you will want to caulk the lumber on the side that connecrs to the sill plate to ensure a good weather/airtight seal.) this now becomes your new flush sill put
  7. the sill plate overhangs or IS recessed from the foundation, use a Ix2, 2x2 or 2x4 piece of lumber cut to the length of the opening of the foundation and attach the lumber to the sill plate so that it is flush with the foundation. This ncw becomes the sill plate to which the faceplate can be mounted

sill plate not bolted to foundation. sill plate not bolted to foundation. Hello world! Posted by on February 5, 2021 in Uncategorized. Wood sole plates at all exterior walls on monolithic slabs, wood sole plates of braced wall panels at building interiors on monolithic slabs and all wood sill plates shall be anchored to the foundation with minimum 1 / 2-inch-diameter (12.7 mm) anchor bolts spaced not greater than 6 feet (1829 mm) on center or approved anchors or anchor straps. 5. Sill plates which are not connected to the foundation or are connected with less than what is required by Section 91.9204.3.1. 6. Cripple walls that are not braced in accordance with the requirements of Section 91.9204.4 and Table 92-A of this chapter. Section 9204 Strengthening Requirements. 9204.1 General. 9204.1.1 Scope Before you can erect your garage wall framing, you will have to locate and drill the anchor-bolt holes into the sole plates and place your sill-sealer onto the foundation where the wall will sit. It is best to oversize the anchor-bolt drill holes a bit so you can adjust the wall location in-and-out at the sole plate for straightness Add to cart. This item: FRFP 7 in. x 9 in. Retrofit Foundation Plate. $19.69. Simpson Strong-Tie URFP 10-5/8 in. x 6-1/4 in. Universal Retro Foundation Plate with Screws. $24.71. Simpson Strong-Tie HL 3-1/4 in. x 2-1/2 in. Galvanized Heavy Angle. $7.11

Barrier to the middle of the TERM Sill Plate Barrier as shown on the graphic. This bead will insure a complete seal between the barrier and the sill plate in areas of irregular level. i. Now the is concrete ready for installation of the sill plate. You can nail through the sill plate, as the sealant is self-healing. If this is the case, you must level the slab before building. Shimming an entire structure is not advisable, ever, so you'll have to either find a new foundation for your shed or pour new concrete on top to achieve a level surface. While this is lots more work, it still beats, making an entirely new foundation for a shed. Step 2: Plan Your Buil Besides, what is the purpose of a sill gasket? Sill seal is ribbed polyethylene foam used to seal the gap between the sill plate and the foundation. The ribs effectively seal out air currents, moisture and insects, leaving you worry free to enjoy your home.Sill seal is available in 3/16 by 50 foot long rolls in widths of 3 ½, 5 ½ and 7 ½.. Here's how to properly install a sill plate on top of a foundation wall. Sink anchor bolts into your foundation every four feet, laying a sill seal on top of the foundation to create a weather barrier. Pre-drill two-by-six sills to accommodate the bolts. Use pressure-treated lumber to resist water and insect damage If the sill plate overhangs or is recessed from the foundation, use a 1x2, 2x2 or 2x4 piece of lumber cut to the length of the opening of the foundation and attach the lumber to the sill plate so that it is flush with the foundation. This now becomes the sill plate to which the faceplate can be mounted

Sill plate flashing - GreenBuildingAdviso

a type of frame in which studs are continuous from foundation sill plate to roof. band joist (Boxer) wedge-shaped piece of material used behind pieces for the purpose of straightening them or for bringing their surfaces flush. sill. metal flashing plate over the foundation to protect wood members from termites Measure in 5 ½ in from the end of the sill and mark the 2 x 6. This mark will line up with the snapped line on the rear wall. The sill will also extend past the snapped line on the front wall by 5/1/2. LOCATING BOLT HOLES: Butt sill stock end to end, against the bolts. Use a speed square to mark both sides of the bolts TERM Sill Moisture|Termite Barrier blocks moisture and cold air from the exterior, and energy leaks from the interior. 4. TERM Sill Moisture|Termite Barrier excludes foraging insects such as ants and cockroaches from entering at gaps between the sill plate and the not quite level slab. 5

sill anchor holes. Once all anchor holes are drilled, reposition the frame on the areaway and anchor each side piece to areaway foundation using (3) 1/4 x 2 nail driven anchors provided as shown in Figure 2A. Anchor the sill to areaway foundation using (3) 1/4 x 2 nail driven anchors provided. Page Finish the foundation according to good building practices and within applicable building codes. Removes all high points up to 1/4″. Unroll ShelterSeal™ on top of the foundation wall flush with the face of the wall or staple to the bottom of the sill plate, or tilt up wall section. Cut ShelterSeal™ to fit over anchor bolts. Position sill. Noun ()(architecture) (also window sill ) A horizontal slat which forms the base of a window.She looked out the window resting her elbows on the window sill . (construction) A horizontal, structural member of a building near ground level on a foundation or pilings or lying on the ground in earth-fast construction and bearing the upright portion of a frame If there are no sill bolts or ties in a block wall, i have used cut nails in the mortar joints to secure a sill plate before, at GC request. not a great way to secure a sill plate, but I have done it and seen it done more than once. It'd be more difficult to see cut nails in the sill, but they may still be there A sill plate, also known as a sole plate, is the bottom horizontal part of a wall or building to which the vertical studs will be attached. Most sill plates are made from lumber - usually.

How to Install Sill Plates: 12 Steps (with Pictures) - wikiHo

Quote: put the INSIDE of the wall flush with the inside of sill plate and not vice versa. If the garage is to have siding, the outer edge of the sill plate should be flush with the outer edge of the foundation/block. This allows for the siding to overlap the foundation and for water to shed properly. Any excess width of the foundation is left. Caulking sill plate and foundation. Bought my first house a few months back and I have quite a few bugs in the basement, as you can see here. Rather than trying to kill the bugs, I'd like to seal them out. I've already gone around and sealed the gaps made by pipes/wiring going into the house. The second step I thought I'd do is to seal the gap. Have used this detail for over 20 years with no problems, but I only cantilever it an 1 1/2. A few points; no real difference than a 2x4 wall with 2x2 furring, makes a nice clean detail for flushing out 2 (R-10) foundation insulation with sheathing (I use a piece of 12 wide prefinished roll flashing to cover the exposed insulation), as for the shear wall concern the NDS permits neglecting. The sill plate is secured to the foundation, the subfloor to the sill plate, and the walls/ sheathing to the subfloor. There are no specific code requirements that I can find that specify the need to nail the sheathing to the sill plate. 03-18-2008, 12:56 PM #5. Jerry Peck. View Profile

The New House Next Door: Structural Primer

The sill plates do not appear to have enough anchors (bolts) to the foundation. dandersen (David A. Andersen, TN HI# 40) December 19, 2016, 4:00pm #6 Brick is not a structural member here A sill gasket is a foam strip used to seal against air leakage, moisture, and insect intrusion in many applications. I chose to have this done in my new home. Some builders say that you can use a sill gasket in conjunction with a regular, non-pressure treated pine or fir bottom plates If not I suggest snapping parallel sill lines on the load bearing sides of the foundation ensuring no part of the foundation protrudes past the exterior side of the sill. You can do this by taking to sections of your (sole plate) and run a chalk line or string along the outer edge of the slab Notice how the plate is 1/2 in from the outside of the foundation at the corner but farther away it is flush with the outside of the foundation. This foundation is out of square. After you have the sill plate installed you will be able to measure the exact height of the basement bearing walls or the beams used for bearing in crawl spaces

We have done quite a few houses this way. I draw the sill plate and subfloor so it goes over the outside of the wall and the rest is held back and dropped down so it sits inside the foundation. -Mark: markpetri 2009-07-23 19:54:45 The ABs are solids I threw in to pretty up the drawing. BruJenn 2009-07-23 17:28:1 Adding insulation to the outside foundation would not impact where you put your sill plate or face of wall above. It could affect it. If you were planning to add say 2 of foam board all the way up the poured basement wall and to the frame wall above then the framed wall would line up with the exterior poured basement The sill plate helps to keep the horizontal slab edge foam in place during the pour and anchors the vapor barrier. The vapor barrier is run long around the edges. Once the walls are framed and stood up, the vapor barrier is pulled up the outside face of the wall and taped to the Zip System sheathing to create a continuous air barrier Sill plate overhanging stem. I don't have any literature with me that would better explain the tolerances of the sill plate overhanging the stem wall. I would assume 100 percent bearing is expected. Today I saw 1-1/2 inch overhang. The anchor bolts in these areas were installed about an 1-1/2 inch away from the interior edge of the plate

Sill Plate Overhang - Structural engineering general

  1. e lineal type needed a. mb - use with 2x4 sill plate, metal buildings and other full bearing wall systems b. fb - use with 2x6 sill plate, ICF block, SIP and CMU systems c. Flash - use to protect insulation adhered to slab edge in slab constructions that do not incorporate EnergyEdge lineals 2
  2. cleanout flush with wall (wco) at 12 above finished floor-diameter as indicated cleanout flush with ground (gco) and concrete block-diameter as indicated floor drain (fd) with trap. water heater 1. all natural gas appliances to be installed per manufacturer's specifications and installation instructions. 2
  3. SPS 321.22(10) (10) Sill plates. All of the following requirements apply to a sawn-lumber sill plate with uniform loading that is partially extended beyond the load-bearing surface of a foundation wall in order to put the exterior surface of an upper-lying wall flush with or beyond the exterior surface of insulation that is placed on the.
  4. The sill plate is where the frame of the home and the foundation meet and these two do not always sit flush with one another. This allows pests and air carrying moisture to enter your crawlspace. By sealing the sill plate and crawl space vents, you are helping to deter pests and control the amount of air carrying moisture that is entering your.

m Foundation sill bolt diameter and spacing from shear wall schedule or notes m Bolts not less than 7 bolt diameters from ends of sill piece; not more than 12 inches from ends; not less than 1 inch from edge of sill plate; not less than 11/2 inches to edge of concrete foundation. m Verify square plate washer is used on bolts Check the sill plate to ensure that is has been adequately bolted to the foundation. Check to ensure that the sill and top plates and the studs are the same dimensions (flush at the face). If not, block between the studs and nail the blocks into the plates with six 16d nails per block to create a flush nailing surface for the plywood A sill nosing is designed to cover concrete or wood sub-sill. Squareback Thresholds Squareback thresholds have a flush interior support leg to sit flush against the interior jamb, allowing flooring to squarely abut the threshold The customer is responsible for the 2×8 treated wood sill plate that must be secured to the foundation w/bolts flush to the sill plate (according to the blueprints). The customer is responsible for providing the support posts. If steel support posts are used, make sure they are the one-piece steel posts (3″ diameter minimum) with screw.

Sill plate and block foundation - Small Cabin Foru

We placed our block 5 in. from the outer edge of the sill plate so that the 3-in. thick panel would stand 2 in. from the outside of the foundation. But there are no rules here; your panel can stand far inside the rough opening or nearly flush with the outside of the foundation First, draw in the Sill Plate and Subfloor and then run a Cleanup. This will place the Subfloor on top of the Sill Plate. Next, draw in the joists using Joist Set or Joist Poly. Once drawn, and prior to running a Cleanup, edit each joist set and remove the checkmark from the Cleanup. This will stop the joists from cleaning up to the outside of.

ShelterSeal Sill Seal

Foundation Plate The FRFP is the improved replacement for the FAP. The new design offers higher loads and is ideal where the mudsill is flush to the inside of the foundation (or up to 1½ set back). In addition to the three prescriptive sill plate fastener holes, there are two optional holes which, when filled, provid Sill pans have been installed (where applicable). Field Installation Instructions for Vinyl Sliding Glass Doors Nail Fin 2 5. Make sure there are no bolts sticking out of the foundation and are cut flush with the foundation. 6. Framing material should be of 2x4, 2x6, or 4x4. In some cases sheer panel is used on the exterior of the opening

The FRFP is the replacement for the FAP. The design offers higher loads and is ideal where the mudsill is flush to the inside of the foundation (or up to 1½-inch set back). In addition to the three prescriptive sill plate fastener holes, there are now two optional fastener holes which, when filled, provide increased loads and more spacing options foundation wall, making sure it is flush with the face of the wall, or for tilt wall construction, staple Kingspan GreenGuard® Sill Sealer to the bottom of the sill plate. 4. Butt all end and perpendicular joints tightly; do not overlap. 5. Impale Kingspan GreenGuard® Sill Sealer to fit over anchor bolts. 6. Set sill plate on the top of the.

What are sill plate requirements? Sill plates are considered part of the foundation. Sill plates should be fastened with mudsill anchor straps. Anchor straps are preferred as they are flush and do not hinder setting of cabin. A Simpson MAB23 or similar mudsill anchor is recommended approximately every 4' . See you tube video on mudsill anchor Simpson Strong-Tie supports the use of the Titen HD screw anchor model no. THD75100H with the CONNECT-EZ panel anchor (PA-12) when conforming to the details shown in this letter. Engineering Letter. Titen HD ® As a Replacement for Sill Plate Anchorage into Poured Concrete Foundation Walls. L-A-THD50WHCAN21 All perimeter foundation sill plates are to be anchored to the foundation. Foundation sill plate anchor bolt spacing • Sheathing nailing shall be driven flush with the sheathing surface, but not break the sheathing face. Where nail breaks the sheathing face, add another nail half way between existing nails and hand-drive flush

If replacing an existing vent, remove the mortar that secures the vent to the foundation using a hammer, flat pry bar and/or large masonry chisel. Crawl Space Vent Installation. Once it is verified that the faceplate fits flush with the sill plate and foundation, caulk the backside of the faceplate with ample caulk to insure a quality seal sill sealer to be placed between the top of the foundation and the sill plate. Conventional sill sealers do not have the thickness or the self-adhesive characteristics of Protecto Premium Energy Sill Sealer to give them the ability to conform or seal up these irregularities leaving a tremendous amount of voids

We do not provide nor install this insulation; it will be the owner's responsibility after the cabin is set. We highly advise that the rim joist, sill plate, foundation connections be sealed and insulated with spray expanding foam after the cabin is set. This foam is an excellent insulator, it also keeps the air drafts and insects out of the. In addition to the construction problems caused by out of level and square foundations, variations in the foundation create air-leakage points where the sill plate does not conform to the foundation. Current sill sealing practices are insufficient to provide an air tight seal between the concrete foundation and the lower surface of the sill plate

Attach a Sill Plate to a Block Foundation DoItYourself

Foundation bolts must be 12 x 5/8, placed at no more than 6' apart and within 12 of any split in the sill plate. The washer must be 3 square and 3/16 thick, and the bolt, nut and washer must be galvanized. The sill plate (or sole plate) must be 3x8 and must be pressure treated Bowed Wall Repair. The foundation is a critical part of your home because it supports everything above. Because of this, when you have a bowed or buckling basement wall it is very important that you have it looked at by a professional to determine the best way to repair it as quickly as you can. As the bowing gets worse, it can also cause the walls to leak water which may require the. 3.applied texture is not a plaster coat and is not counted in thickness measurement. sequencing of stucco coats detail 1 8 sheathing gap 1 4 min.1 max. lath fasteners to be placed above the center of sill plate fasteners within 1 2 of top of weep screed into vertical framing members above transition sill seal 1 4 lath gap min. an unpainted. By simply removing the drip edge hood extension, the front edge of the sill is flush with the front face of the foundation wall, as in traditional sill plates. This opens the vent slotting to view from the exterior, but that may be preferred in some forms of building sheathing and fascia, like brick or stonework

sill plate and wall plate - SoftPlan 2014 - SoftPlan Users

CUTTING, MARKING, AND DRILLING SILL PLATES Library builde

6) Main basement wall 10' plus double sill plate (3) for 119 net ceiling with 4 slab over footing. Ad 1' at garage and entry for flush access. Joists to hang from sill plate as indicated. Foundation top of wall and pier hts indicated are relative to top of main basement wall On the other hand . . . How does your exterior sheathing fit in? Your drawing shows the primary foundation wall, the sill plate, and the exterior wall studs all the same thickness, and flush to the exterior. Typically for wood framing, the outer face of the sheathing would run over the sill plate and be flush with the outer face of the foundation The real purpose of weep screed is to direct any moisture that gets absorbed and wicks out of the stucco below the plate line, where the concrete foundation starts. That is why the bottom of the weep screed hangs down below the sill plate about 1 1/2. Any water that does weep out of the holes in the bottom will hit the concrete foundation. When it comes to sound proofing, I'd recommend a bit different approach. Instead of framing with 2×6's, I would use either 2×6 or 2×8 top and bottom plates. Then use 2×4 studs. Frame the studs flush to the basement side at either 16″ o.c. for 1/2″ rock or 24″ o.c. for 5/8″ rock. Install the fiberglass on that side Solar Pathfinder - Solar site analysis Once, the greenhouse location is selected with abundant sun and shade.As well as proximity to essential services such as water and power. Your greenhouse, whether it is a home attached greenhouse addition or a free standing greenhouse structure, always start by mapping out a layout.Once the area is mapped out with a string line or the ground is outlined.

Align Foundation to Framing - General Q & A - ChiefTalk Foru

Minimum two bolts per plate/sill piece with one bolt located maximum 12 inches and minimum 7 bolt diameters from each end of each sill plate/piece e. Minimum 3-inch by 3-inch by .299-inch steel plate washer between sill and nut on each bolt 6. Hold-downs. All hold-downs must be tied in place prior to foundation inspection. 7 Beams - posted in SoftPlan 2016: In system options or another place in the program, is there any way to set basement beams offset default to be 1 1/2 off the foundation wall (accommodating for the sill plate)? Also when using a beam in the layout is there a box that I can check so the beam information is displayed on the layout or do I have to do that manually with a speed note/text

Building a Lean To Shed - Framing and Siding - Wilker Do'sRepairing Rotten Sill Plate and Rim Joist - Fasoldt Gardensflush track at sliding door detail - Google Search